Hi guys, i want to model a situation where there are multiple steps (say, process 1, 2, and 3) that each entity needs to go through. I have a set of servers (say, server 1, 2, and 3). Each server has its own shift schedule. Every entity needs to utilize the same server who was chosen at the 1st process for the rest processes, unless this server has finishes his shift and is inactive now. Then the entity can pick another available active server for the rest processes.

Can anyone please give me some advice how to model this logic? Thank you so much.

Laura923 is offline   Reply With Quote
Old 08-04-2015, 03:24 PM   #2
Solid State Member
Join Date: Feb 2014
Location: Brazil
Posts: 11
Default Re: Arena simulation question

Use the block "Process" and inside the option "Seize and Delay" on the first
pedromss is offline   Reply With Quote

arena, resource schedule, shift change

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off

All times are GMT -5. The time now is 10:15 PM.

Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2016, vBulletin Solutions, Inc.
Search Engine Friendly URLs by vBSEO 3.6.0